NRM2 Explained: What UK Builders and Developers Need to Know About the New Rules of Measurement

NRM2, in full New Rules of Measurement 2: Detailed Measurement for Building Works, is a RICS publication setting out standard rules for measuring building works. It was prepared by the RICS Quantity Surveying and Construction Professional Group and published in April 2012, becoming operative from 1 January 2013.

In practical terms, NRM2 tells a quantity surveyor or estimator exactly how to measure and describe each part of a building, from groundworks to finishes, so that the resulting bill of quantities means the same thing to every contractor pricing it. In this context, a shared standard matters because without one, two estimators measuring the same drawings could easily produce different quantities, and comparing tenders becomes far less reliable.

NRM2 sits within a broader system of cost management and procurement across the construction industry, feeding directly into tender pricing once a project reaches the stage where detailed quantities are needed.

What Is NRM2?

A loft conversion generally costs less than an extension of a comparable size, mainly because it makes use of an existing structure rather than requiring new foundations, external walls, and a roof. Our guide to loft conversion costs and our guide to house extension costs both break down current ranges in more detail, and comparing the two side by side for your own property is the most useful starting point.

As a general pattern, a loft conversion adding a single bedroom typically sits below the cost of a single-storey rear extension delivering similar floor area, though the gap narrows or reverses depending on roof type, whether structural work like a steel beam or dormer is needed, and the specification chosen.

The RICS NRM Suite: Where NRM2 Sits

NRM2 is one part of a wider suite of RICS documents covering the full lifecycle of a construction project, from early cost estimating through to ongoing maintenance. Together they’re often referred to as the NRM suite, and understanding where each one fits helps make sense of NRM2’s specific role.

NRM1 vs NRM2 vs NRM3: What Each One Covers

NRM1 covers order of cost estimating and cost planning for capital building works, used at the early stages of a project when detailed drawings may not yet exist. NRM2 covers detailed measurement for building works, used once drawings are developed enough to produce a proper bill of quantities for tendering. NRM3 covers order of cost estimating and cost planning for building maintenance works, focused on the ongoing running and lifecycle costs of a building rather than its initial construction.

The three documents are designed to work together, with NRM3 in particular structured to align with NRM1, so that a cost plan produced early in a project can be tracked through into detailed measurement and, eventually, into maintenance cost planning once the building is complete.

NRM2 vs SMM7: What Changed

According to Designing Buildings Wiki, NRM2 formally replaced the Standard Method of Measurement, seventh edition, known as SMM7, which had been the industry standard since 1988. NRM2 became operative on 1 January 2013 and formally superseded SMM7 on 1 July 2013.

The differences between NRM2 and SMM7 go beyond a name change. NRM2 uses a more comprehensive, element-based structure and work breakdown structures rather than SMM7’s trade-based approach, provides clearer rules for quantifying contractor-designed work and risk, and measures more items separately rather than treating them as “deemed included” within another item. NRM2 also gives more detailed guidance on preliminaries, including how overheads and profit should be dealt with, and on the actual content, structure, and format of a bill of quantities itself, which SMM7 addressed less thoroughly.

It’s worth noting that SMM7 hasn’t disappeared entirely. Some older or ongoing contracts still specifically reference SMM7, and where a contract names SMM7 as the applicable method, that’s what should be used, rather than substituting NRM2 rules simply because they’re more current.

NRM2 Measurement Rules: How Work Is Classified

NRM2 sets out detailed measurement rules covering how each type of building work should be quantified, described, and coded, so that a bill of quantities produced by one estimator can be understood and priced consistently by any contractor reading it. This includes the unit of measurement to use for each item, how work should be classified and grouped, and how non-measurable items, such as certain risks or contractor-designed elements, should be dealt with within the document.

Work Sections Under NRM2

NRM2 organises building work into a structured set of work sections, running from preliminaries through to external works, each covering a distinct category of construction activity. These sections give a bill of quantities a consistent, recognisable structure across different construction projects, so a contractor’s estimating team can move between jobs without relearning how the document is organised each time.

NRM2 and the Bill of Quantities

One of NRM2’s central purposes is guiding the preparation of a bill of quantities, the formal, itemised document listing everything a contractor needs to price to submit a tender. NRM2 provides detailed rules on what a bill of quantities should contain, how it should be structured, and what information needs to be available before it can be properly prepared.

A bill of quantities produced to NRM2 standards allows every contractor tendering for a job to price exactly the same scope of work, using the same units and descriptions, which is what makes their submitted prices genuinely comparable rather than each contractor having quietly interpreted the drawings slightly differently.

Provisional Sums Under NRM2

NRM2 also sets out clearer rules for provisional sums, allowances included in a bill of quantities for work that can’t yet be fully defined or detailed when the document is prepared. Compared with SMM7, NRM2 gives more defined categories for provisional sums, which reduces ambiguity over what a provisional sum actually covers and how it should be treated once the work is eventually defined and priced.

NRM2 in Practice: How a Quantity Surveyor Uses It

In practice, NRM2 is applied by a quantity surveyor or estimator working from a project’s drawings and specification to produce a bill of quantities. This involves measuring quantities for each work section, applying NRM2’s rules on classification and description, and structuring the resulting document so contractors can price it consistently.

NRM2 in practice isn’t limited to new-build projects. It applies wherever building work, as distinct from civil engineering or highway works, is being measured for the purpose of tendering, whether that’s a straightforward extension, a larger commercial building, or a multi-unit residential scheme.

NRM2 vs CESMM4: Building Works vs Civil Engineering

NRM2 applies to building works specifically. Civil engineering projects, such as roads, bridges, and major infrastructure, are generally measured under a separate standard, CESMM4, the Civil Engineering Standard Method of Measurement, published by the Institution of Civil Engineers rather than RICS.

Where a project includes both building work and a genuinely civil engineering element, such as a building with associated infrastructure, it’s worth being clear about which parts fall under NRM2 and which fall under CESMM4, rather than applying one standard across the whole project simply because it’s more familiar.

Cost Plan to Bill of Quantities: Where NRM2 Fits

A typical project moves from an early cost plan, prepared under NRM1 with limited design information, through to a detailed bill of quantities prepared under NRM2 once drawings are sufficiently developed. Understanding this progression matters because it explains why an early cost estimate and a later, NRM2-based bill of quantities can show different figures for the same project, they’re prepared at different stages, with different levels of design information available.

Cost Plan to Bill of Quantities: Where NRM2 Fits

A typical project moves from an early cost plan, prepared under NRM1 with limited design information, through to a detailed bill of quantities prepared under NRM2 once drawings are sufficiently developed. Understanding this progression matters because it explains why an early cost estimate and a later, NRM2-based bill of quantities can show different figures for the same project, they’re prepared at different stages, with different levels of design information available.

Cost Value Reconciliation and NRM2

NRM2’s consistent structure also supports cost value reconciliation during a project, the ongoing process of comparing actual costs incurred against the values allowed for in the original bill of quantities. Because NRM2 measures and codes work consistently across different buildings and projects, it produces reliable cost data that’s more straightforward to track and reconcile, rather than trying to compare figures measured under inconsistent or unclear rules.

Why NRM2 Matters for Builders and Developers, Not Just Surveyors

Builders and developers who aren’t quantity surveyors themselves still benefit from understanding what NRM2 is. A bill of quantities prepared properly under NRM2 gives you a document you can genuinely compare between contractors, since every tenderer is pricing the same defined scope rather than their own interpretation of it. It also gives you a clearer basis for agreeing variations during the build, since work not originally covered can be measured and priced using the same consistent rules as the rest of the document.

For anyone commissioning building works, from a straightforward extension to a full development scheme, asking whether quantities have been measured to NRM2 is a reasonable question to put to your estimator or quantity surveyor.

Getting NRM2 Measurement Right on UK Projects

Getting NRM2 measurement right depends on having sufficiently developed drawings and specification information before detailed measurement begins, since NRM2’s rules assume a certain level of design maturity. Projects measured too early, before the design is settled, risk a bill of quantities that needs significant revision once details change, undermining the consistency NRM2 is meant to provide in the first place.

Frequently Asked Questions

NRM1 covers order of cost estimating and cost planning for capital building works, typically used early in a project. NRM2 covers detailed measurement for building works, used to prepare a bill of quantities once drawings are developed enough for tendering. NRM3 covers order of cost estimating and cost planning for building maintenance works, focused on ongoing running and lifecycle costs after construction.

The RICS New Rules of Measurement are a suite of three documents, NRM1, NRM2, and NRM3, published by the Royal Institution of Chartered Surveyors, setting out standard rules for cost estimating, cost planning, detailed measurement, and whole-life costing across a construction project.

In UK construction supply chains, a Tier 2 contractor is generally a subcontractor working directly for the main, or Tier 1, contractor, rather than holding a direct contract with the client. Exact definitions can vary depending on the specific project or framework.

Tier 3 contractors generally sit a level further down the supply chain, typically subcontracted to a Tier 2 contractor rather than the main contractor directly, often specialist trades or suppliers. As with Tier 2, precise definitions can vary by project and framework.

Get an Accurate NRM2-Based Estimate

Whether you need a detailed builders estimate measured to current RICS standards or want to understand how your bill of quantities has been prepared, working from properly measured quantities is the foundation of a tender you can actually rely on. Our guide to what a bill of quantities is and when you need one covers this in more practical detail.

To talk through your project’s measurement and estimating needs, get in touch with the ProQuant team.

About the author
Ollie Wilcox

With a strong foundation built from hands on site experience in his early career, Oliver Wilcox brings a practical and informed perspective to the construction industry. He went on to earn a BSc (Hons) in Building Studies, further strengthening his technical expertise and understanding of the built environment.

Following this, he spent 10 years working within the estimating sector, developing a deep knowledge of cost planning, measurement and project evaluation across residential developments.

In 2011, he co-founded Proquant Estimating LTD alongside his business partners, with a vision to deliver affordable, accurate, efficient and reliable estimating services.

Since then, the company has grown significantly and is recognised as the leading residential estimating service throughout the UK.

His combined site experience and professional expertise continues to drive Proquant’s commitment to precision, quality and client focused delivery.

2 Comments.