For a typical residential build or extension, a thorough takeoff works through the project element by element, following a standard order.
Groundworks and foundations: Volume of excavation, concrete for strip or raft foundations, hardcore fill, blinding layers, damp proof membranes, drainage runs and fittings.
External walls: Areas of facing brick, inner skin blockwork, insulation thickness and type, cavity ties, lintels, mortar quantities.
Roofing: Roof area, truss or rafter quantities, tile or slate coverage, felt and batten, ridge and hip components, lead or EPDM for flat sections, fascia, soffit, and guttering runs.
Finishes: Floor and wall areas for plaster, screed, tiling, and decoration. Ceiling areas. Skirting and architrave runs.
The list is long because a building is made of many things. Every item that gets missed or miscounted is a potential error in the final cost plan.